Changes between Version 8 and Version 9 of ENOptimProjectGestionClientsOptions
- Timestamp:
- Jul 30, 2008, 11:04:41 AM (17 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
ENOptimProjectGestionClientsOptions
v8 v9 41 41 ||Splitting the jobs on several machines||Authorizes the use of identical machines to manufacture products in parallel in order to reduce the estimated time of manufacture.|| 42 42 ||Date of order differs from the date of creation||Authorizes the user to change the date command to a file, if the order date is the one that corresponds to the date of creation of the file. This date determines the choice of catalogues (paper, printer), which are valid only over a certain period.|| [[XlImage(FROptimProjectGestionClientsOptions:commande.png, 100)]] 43 ||calculation without assembly costs||When the option is yes forms design brochure have an option on costing assembly. If this new option is activated (calculation without assembly) then the description of the assembly (type of assembly, machine) will be mentioned in machine operating processing cost but the assembly will not be counted.|| [[XlImage(FROptimProjectGestionClientsOptions:calculassemblage.png, 100)]]43 ||calculation without binding costs||When the option is yes forms design brochure have an option on costing binding. If this new option is activated (calculation without assembly) then the description of the assembly (type of assembly, machine) will be mentioned in machine operating processing cost but the assembly will not be counted.|| [[XlImage(FROptimProjectGestionClientsOptions:calculassemblage.png, 100)]] 44 44 ||printing quality selection (std / top)||Authorizes the choice of print quality (quality standard or luxury), if the choice is made the better.|| [[XlImage(FROptimProjectGestionClientsOptions:qualitedimpression.png, 100)]] 45 45 ||prepress selection (CTP/film) ||Authorizes choice of prepress (CTP or film), if the choice is made the better.|| [[XlImage(FROptimProjectGestionClientsOptions:prepresse.png, 100)]]