| | 5 | = Sheet collators = |
| | 6 | |
| | 7 | To add a new sheet collator, you go to 3 menus: |
| | 8 | |
| | 9 | * characteristics |
| | 10 | * quantities |
| | 11 | * delivery |
| | 12 | |
| | 13 | == Characteristics == |
| | 14 | |
| | 15 | You go to the technical characteristics of the machine which breaks down into 5 categories. |
| | 16 | |
| | 17 | === General informations === |
| | 18 | |
| | 19 | They correspond to administrative informations: |
| | 20 | |
| | 21 | * her name |
| | 22 | * is it active in the calculation? |
| | 23 | * it is contrary to internal or do you use a subcontractor? |
| | 24 | |
| | 25 | === Open sizes === |
| | 26 | |
| | 27 | It corresponds in going size with 2 fields to fill: |
| | 28 | |
| | 29 | * height ( minimum et maximum) which corresponds to the width of the buckle. |
| | 30 | * lenght (minimum et maximum) which corresponds to the depth of the buckle. |
| | 31 | |
| | 32 | These 2 sizes are set in millimeters. |
| | 33 | |
| | 34 | An option is available to determine if the size adjustment in included in the rate folding. |
| | 35 | |
| | 36 | === Paper weight === |
| | 37 | |
| | 38 | They are expressed in g/M2 also with 2 fields: the minimum and maximum weight that can pass on this machine. |
| | 39 | |
| | 40 | === Miscellaneous === |
| | 41 | |
| | 42 | These options on the machine |
| | 43 | |
| | 44 | * number of gathering stations |
| | 45 | * limit to one passage? |
| | 46 | * 2 calculations: |
| | 47 | |
| | 48 | price per 1000 sheets c'est à dire: price per 1000 X quantity X nb of copies |
| | 49 | |
| | 50 | price per 1000 runs c'est à dire: price per 1000 X quantity. |
| | 51 | |
| | 52 | * is it possible to automatically numbering ? |
| | 53 | |
| | 54 | === Selling prices === |
| | 55 | |
| | 56 | These pricing base include fixed costs and variable costs: |
| | 57 | |
| | 58 | * starting makeready wich corresponds to a fixed cost general |
| | 59 | * makeready per station ( per type of models) |
| | 60 | * add makeready cost for numbering |
| | 61 | * add cost per 1000 if numbering |
| | 62 | |
| | 63 | == Quantity == |
| | 64 | |
| | 65 | this screen allows you to make a variation of a standard price per 1000 according to quantities( per steps). |
| | 66 | |
| | 67 | Each rule is applicable individually and the system takes into account the most advantageous. |
| | 68 | |
| | 69 | WARNING: If you set : |
| | 70 | |
| | 71 | < à 2000 runs then variations de -10% |
| | 72 | |
| | 73 | < à 3000 runs then variation de -5% |
| | 74 | |
| | 75 | In this case, for a quantity of 1000, the system will take a variation - 10%. |
| | 76 | |
| | 77 | The rules are put into competition in their field of validity. If both rules are checked, the most advantageous being chosen. |
| | 78 | |
| | 79 | == Transport == |
| | 80 | |
| | 81 | Cet onglet permet de tarifier, si la machine est en externe (c'est à dire chez un sous traitant), le coût de transport aller / retour depuis l'imprimeur vers le sous traitant. |
| | 82 | |
| | 83 | Il existe 3 façons de le tarifer: |
| | 84 | |
| | 85 | * avec un coût fixe |
| | 86 | * avec un coût proportionnel au kg |
| | 87 | * avec un forfait minimum. |